Oil City Commercial Roofing Contractor

New Rooftop Units Built Into The Roof From The Start

As an Oil City commercial roofing contractor, we replace warehouse and office roofs and build in the curbs and openings for new rooftop equipment.

Plain crane truck lifting membrane rolls to a brick building roof beside a box truck with blank doors

Adding Equipment During Oil City Commercial Roofing

Oil City commercial roofing jobs that add units go best when the equipment plan is fixed before the roof is priced.

New rooftop units need curbs, supports, and openings through the deck. We check that the deck and framing can carry them and set each curb before the membrane goes around it.

Your mechanical contractor gives us unit sizes and locations early. That way drains, walkways, and service access fit around the new layout instead of being cut in later.

  • Curbs set before the membrane goes down
  • Deck openings framed and checked for load
  • Service paths drawn to the new units
Top-down view of a flat roof torn off to the deck on one half, with new membrane, insulation pallets, and a debris chute on the other

Commercial Roofing Risks When Oil City Buildings Add Units

New equipment changes the roof in five places. We plan each one before tear-off.

Deck Openings

A new unit needs a framed opening through the deck. Cutting it after the roof is done leaves patched membrane right where water collects.

Curb Height

Curbs have to clear the new insulation by enough height for full flashing. Short curbs are the first place a new roof leaks.

Framing Load

Heavy units and their snow drifts add weight to joists that carried nothing before, so the frame gets checked first.

Drain Paths

A big unit can block the slope to a drain. Tapered insulation gets laid out around the new footprint.

Service Access

Techs need a path from the hatch to each new unit. Pads planned now keep them off the open field later.

Why Oil City Owners Add Units During Commercial Roofing

One coordinated job is the main gain. Better flashing and fewer later cuts come with it.

Equipment And Roof Built As One Job

Curbs, supports, and openings go in while the roof is open, then the membrane and flashing are finished around them. Nothing gets cut through finished roofing weeks later.

  • Curbs and supports set first
  • Membrane flashed to full curb height
  • Openings sealed before the units arrive

Insulation Laid Around Units

Tapered board is cut to the new unit layout, so water flows around curbs to the drains instead of pooling behind them.

One Crane Day

Roof materials and new units can share a lift when schedules line up, which shortens the time the lot is blocked.

One Scope For Both Trades

The written scope shows which work belongs to the roofer and which to the mechanical contractor.

Commercial Roofing Systems On Oil City Warehouses

Each of these systems can be built around new equipment. The choice depends on the roof and the building below.

TPO welds cleanly to molded curb flashing, which makes it a common pick when several new units go onto an Oil City warehouse roof.

Best For
  • Warehouses adding units
  • Recover over one dry roof
Watch For
  • Seams near new curbs
  • Cold-weather welding
TPO Roofing details

Rubber suits offices adding one or two small units, where flexible flashing wraps new curbs without many seams.

Best For
  • Office buildings
  • Small new units
Watch For
  • Adhesive in cold weather
  • Laps beside new curbs
EPDM Roofing details

Process buildings adding exhaust fans or makeup air units need heavier curbs and walkway layouts planned with the equipment.

Best For
  • Process and shop buildings
  • New exhaust fans
Watch For
  • Frame capacity
  • Vibration at curbs
Industrial Roofing details

Ordering New Rooftop Units This Year?

Bring the unit sizes to the roof walk. Curbs and openings priced with the roof cost less than cutting them in later.

What To Have Ready
  • The property address
  • Where water shows up inside
  • Roof age, if you know it
  • New unit sizes and locations

How Oil City Commercial Roofing Jobs With New Units Run

Five steps keep the roof and the equipment work in the right order.

Drone view of a crew rolling white TPO across half of a brick office roof in Erie, PA, with a rail yard and Lake Erie beyond
  1. Collect The Unit Plan

    Planning

    Sizes, weights, and locations come from your mechanical contractor before the roof is measured.

  2. Check Deck And Frame

    Structure

    Where new loads land, the deck and joists are checked, and an engineer reviews heavier units.

  3. Open, Frame, And Curb

    Openings

    Deck openings are cut and framed, and curbs and supports go in before insulation is laid.

  4. Build The Roof Around Them

    Install

    Insulation, membrane, and curb flashing go down section by section around the new layout.

  5. Hand Off To The Mechanical Crew

    Handover

    Curbs are capped and ready, and pads mark the service routes before units are set.

Nearby Towns Beyond Oil City

Outside Oil City? Call us or send us a message. These towns are part of our regular work.

TownCountyWhat We See On Roofs There
Erie Home BaseErie CountyPlastics plants, rail shops, and port warehouses with drifts and iced drains each winter
MeadvilleCrawford CountyPlant roofs replaced in sections timed to process shutdowns
WarrenWarren CountyFinished plant roofs that other trades cross with tools and parts
CorryErie CountyOwners weighing two or three bids for the same roof
FranklinVenango CountyLeased warehouses where owner and tenant share the reroof plan

Oil City Commercial Roofing Questions

Asked Most

What should an Oil City warehouse inspect before adding rooftop equipment during reroofing?

Check the deck and framing that will carry the units, and the connections each unit needs. Curbs, drains, and service access then get laid out with the new equipment, all settled before the roof is finished around the openings.

Who sets the curbs, the roofer or the mechanical contractor?

The scope says. Often the roofer sets curbs and flashing while the mechanical contractor sets and connects the units. Writing it down early keeps any curb from being left without flashing.

Can old units stay where they are during the reroof?

Often, yes. Units that stay are lifted, the curb is raised to clear the new insulation, and the unit is reset. Units being replaced come off before tear-off.

What if the new units arrive after the roof is done?

Curbs are capped and flashed in place, ready for the units. Setting them later then needs no cuts in the finished membrane.

Does adding units change the roof warranty paperwork?

Any later cut through a new roof should be done by a roofer and recorded. Building the openings in during the reroof avoids that step entirely.

Can the deck carry a heavier replacement unit?

That gets checked before anything is ordered. We look at the deck gauge and the joists under the planned spot, and an engineer reviews the frame when the new unit weighs more or sits where drifts pile up. Moving the unit a few feet onto a beam line often settles it.

What happens to old curbs left from removed units?

They come out during tear-off and the openings get decked over and insulated like the rest of the roof. Leaving an empty curb behind adds a detail that can leak and gives nothing back.

Hire an Oil City Commercial Roofing Contractor

Send the roof address and the unit plan. We will walk it and write one scope for both.